    • DanpD
      Danp
      last edited by

      Received the updated quote with R620 instead of R720, which came in about $600 less per server. Same basic specs expect for a drop in memory from 192GB to 128GB.

      scottalanmillerS 1 Reply Last reply Reply Quote 1
      • M
        mattel
        last edited by

        This reminds me of when I went to canada to purchase some older equipment for a friend of mine. Going into canada was easy. Coming back was the problem. I went through the normal passenger lane unaware that I should have gone through the commercial side both in and out. So coming back in they sent me over to the "building". I filled out the paper work to declare what I had in the van and described the equipment. They made some phone calls to confirm it was allowed back in the USA. I was unsure why it wouldn't be allowed back into the country, as it was manufactured for use in the USA - and was stamped as such. The customs person was very understanding, and suggested that next time have a broker do it. Or at least call the customs office ahead of time to find out what paper work you need to have filled out.

        It likely didn't help that the equipment was paid for in cash, with no receipt ($500), and it was control equipment that is used to monitor temperature and pressure at a power plant....

        Traveling into canada even for a meeting with a company requires a letter of introduction from that company explaining the purpose of the meeting, and whether or not there will be any "sale" or "transactional value" of the meeting. We were going up to meet with a banner ad platform in toronto and got sent to the building to explain ourselves.

        scottalanmillerS 1 Reply Last reply Reply Quote 1
        • prcssupportP
          prcssupport @DustinB3403
          last edited by

          @DustinB3403 said in Virtualization build:

          @MattSpeller said in Virtualization build:

          @DustinB3403 said in Virtualization build:

          @MattSpeller said in Virtualization build:

          I fucking wish we could get pricing like that in Canada.

          Have a buddy buy it for you and hand ship it up.

          border agent: That's a nice server you got there.... be a shame if you had to... pay taxes on it! muahahahaha

          Nothing to claim, a buddy gave me this equipment from his personal lab.

          boarder agent So let me get this straight a buddy gave this too you? Do you frequent Mangolassi.it much? We heard someone was trying to bring up a server under false pretenses. This couldn't be you aye? Muhahaha

          1 Reply Last reply Reply Quote 1
          • DashrenderD
            Dashrender
            last edited by

            In reading these stories about the Canadian border, I recall being questioned about how much cash I had on me, and how I was expect that amount to last me the two weeks I'd be driving through the country - of course the answer was, CCs.

            They weren't any nicer when we walked across the bridge at Niagara either.

            scottalanmillerS 1 Reply Last reply Reply Quote 1
            • scottalanmillerS
              scottalanmiller @Dashrender
              last edited by

              @Dashrender said in Virtualization build:

              In reading these stories about the Canadian border, I recall being questioned about how much cash I had on me, and how I was expect that amount to last me the two weeks I'd be driving through the country - of course the answer was, CCs.

              They weren't any nicer when we walked across the bridge at Niagara either.

              That's weird. I have never been asked something like that before.

              DashrenderD 1 Reply Last reply Reply Quote 0
              • scottalanmillerS
                scottalanmiller @Danp
                last edited by

                @Danp said in Virtualization build:

                Received the updated quote with R620 instead of R720, which came in about $600 less per server. Same basic specs expect for a drop in memory from 192GB to 128GB.

                That's a big memory drop.

                DanpD 1 Reply Last reply Reply Quote 0
                • scottalanmillerS
                  scottalanmiller @mattel
                  last edited by

                  @mattel said in Virtualization build:

                  This reminds me of when I went to canada to purchase some older equipment for a friend of mine. Going into canada was easy. Coming back was the problem.

                  That's always what I've found, too.

                  1 Reply Last reply Reply Quote 0
                  • DashrenderD
                    Dashrender @scottalanmiller
                    last edited by

                    @scottalanmiller said in Virtualization build:

                    @Dashrender said in Virtualization build:

                    In reading these stories about the Canadian border, I recall being questioned about how much cash I had on me, and how I was expect that amount to last me the two weeks I'd be driving through the country - of course the answer was, CCs.

                    They weren't any nicer when we walked across the bridge at Niagara either.

                    That's weird. I have never been asked something like that before.

                    It was 8 years ago, and I did say I was driving through the scenic route on the way to NY - then the question.

                    1 Reply Last reply Reply Quote 0
                    • DanpD
                      Danp @scottalanmiller
                      last edited by

                      @scottalanmiller said in Virtualization build:

                      @Danp said in Virtualization build:

                      Received the updated quote with R620 instead of R720, which came in about $600 less per server. Same basic specs expect for a drop in memory from 192GB to 128GB.

                      That's a big memory drop.

                      It is... however I felt like 192GB was more than I needed. I probably should ask how much the add'l ram would cost and go ahead and get it if the cost is negligible.

                      scottalanmillerS StrongBadS 2 Replies Last reply Reply Quote 0
                      • scottalanmillerS
                        scottalanmiller @Danp
                        last edited by

                        @Danp said in Virtualization build:

                        @scottalanmiller said in Virtualization build:

                        @Danp said in Virtualization build:

                        Received the updated quote with R620 instead of R720, which came in about $600 less per server. Same basic specs expect for a drop in memory from 192GB to 128GB.

                        That's a big memory drop.

                        It is... however I felt like 192GB was more than I needed. I probably should ask how much the add'l ram would cost and go ahead and get it if the cost is negligible.

                        As long as there was a good reason and not just a sudden loss of RAM 🙂

                        1 Reply Last reply Reply Quote 1
                        • StrongBadS
                          StrongBad @Danp
                          last edited by

                          @Danp said in Virtualization build:

                          @scottalanmiller said in Virtualization build:

                          @Danp said in Virtualization build:

                          Received the updated quote with R620 instead of R720, which came in about $600 less per server. Same basic specs expect for a drop in memory from 192GB to 128GB.

                          That's a big memory drop.

                          It is... however I felt like 192GB was more than I needed. I probably should ask how much the add'l ram would cost and go ahead and get it if the cost is negligible.

                          RAM is often super cheap. Get it now and you'll probably find a use for it.

                          1 Reply Last reply Reply Quote 1
                          • S
                            StorageNinja Vendor @thwr
                            last edited by

                            @thwr Those Samsung's make sure they are PM or SM series drives and not 8xx series garbage.

                            thwrT DanpD 2 Replies Last reply Reply Quote 0
                            • thwrT
                              thwr @StorageNinja
                              last edited by

                              @John-Nicholson said in Virtualization build:

                              @thwr Those Samsung's make sure they are PM or SM series drives and not 8xx series garbage.

                              I guess you mean the OP? I wouldn't put consumer drives in a server 😉

                              1 Reply Last reply Reply Quote 0
                              • DanpD
                                Danp @StorageNinja
                                last edited by

                                @John-Nicholson They are supposed to be from the PM series (PM853T).

                                1 Reply Last reply Reply Quote 0