ML
    • Recent
    • Categories
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    Help choosing replacement Hyper-V host machines and connected storage

    IT Discussion
    storage virtualization hyper-v
    17
    183
    102.4k
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • scottalanmillerS
      scottalanmiller @JohnFromSTL
      last edited by

      @JohnFromSTL said:

      Host01 hovers around 9-10% CPU and 55% memory utilization.

      Which CPUs and how many do you have in that host?

      How much memory is in that host?

      1 Reply Last reply Reply Quote 2
      • dafyreD
        dafyre
        last edited by

        I currently have a Dell R720xd running Hyper-V 2012R2. It works really really well. Not sure on the price tag, but that is a nicely built system. Raid controller can do RAID 10, and RAID 6 in addition to the others... Add ram to meet your needs.

        scottalanmillerS 2 Replies Last reply Reply Quote 2
        • scottalanmillerS
          scottalanmiller @dafyre
          last edited by

          @dafyre said:

          I currently have a Dell R720xd running Hyper-V 2012R2. It works really really well. Not sure on the price tag, but that is a nicely built system. Raid controller can do RAID 10, and RAID 6 in addition to the others... Add ram to meet your needs.

          We have a monster R720xd with 128GB too. Sweet machine. R730xd has even bigger CPU options.

          J 1 Reply Last reply Reply Quote 2
          • scottalanmillerS
            scottalanmiller @dafyre
            last edited by

            @dafyre said:

            Raid controller can do RAID 10, and RAID 6 in addition to the others.

            There are others?

            That controller has a 1GB cache too, which is important, AND has CacheCade built in. The R730xd loses the CacheCade option.

            dafyreD 1 Reply Last reply Reply Quote 2
            • dafyreD
              dafyre @scottalanmiller
              last edited by

              @scottalanmiller 😛 RAID 1, most notably... But I didn't want to mention RAID-5 spits on the floor.

              1 Reply Last reply Reply Quote 0
              • scottalanmillerS
                scottalanmiller
                last edited by

                If the R910 is maxing out at, say, 20% CPU, then my guess is that an R720xd will do the trick to take over its load. The R720xd has two, faster procs than the R910. Not only are the individual procs faster, but by moving from quad procs to dual procs you gain a small amount of efficiency just from that one move. So faster procs and more efficient proc usage and then cutting the total number of procs in half.... seems like you will be okay.

                ryan from xbyteR J 2 Replies Last reply Reply Quote 1
                • scottalanmillerS
                  scottalanmiller
                  last edited by

                  Memory is really going to be the biggest thing to start with here for capacity planning. Once we know that number, we will have something strong to work with.

                  1 Reply Last reply Reply Quote 1
                  • KOOLERK
                    KOOLER Vendor @dafyre
                    last edited by

                    @dafyre said:

                    I'd definitely recommend reaching out to the Scale Computing guys (are there any on here?) here or either on SW. For information about pricing. It would be new kit and would last you several years. I think they can do 2 node setups as well.

                    (www.scalecomputing.com)

                    Scale needs 3 nodes, they don't have anything to install on existing servers like OP has and Scale has no Hyper-V support.

                    StrongBadS 1 Reply Last reply Reply Quote 0
                    • KOOLERK
                      KOOLER Vendor @scottalanmiller
                      last edited by

                      @scottalanmiller said:

                      @JohnFromSTL said:

                      Due to our size and budget constraints we purchase refurbished equipment, which are typically 2-3 years old. Whichever solution I end up with needs to last 3-4 additional years.

                      Refurb is good. @xByteSean is around to help out with that. As is @ryan-from-xbyte

                      xBytes allows people to get Dell quality @ SuperMicro price 🙂

                      scottalanmillerS 1 Reply Last reply Reply Quote 1
                      • scottalanmillerS
                        scottalanmiller @KOOLER
                        last edited by

                        @KOOLER said:

                        @scottalanmiller said:

                        @JohnFromSTL said:

                        Due to our size and budget constraints we purchase refurbished equipment, which are typically 2-3 years old. Whichever solution I end up with needs to last 3-4 additional years.

                        Refurb is good. @xByteSean is around to help out with that. As is @ryan-from-xbyte

                        xBytes allows people to get Dell quality @ SuperMicro price 🙂

                        That's a great way to look at it.

                        1 Reply Last reply Reply Quote 0
                        • J
                          JohnFromSTL @scottalanmiller
                          last edited by

                          @scottalanmiller said:

                          @JohnFromSTL said:

                          @Minion-Queen said:

                          NTG can help with the Scale questions so ask away!

                          Any idea on starting price?

                          Did I miss your total memory needs? How much memory are you using added all up?

                          Host01:
                          CPU: (4) - Xeon X7350 @ 2.93GHz
                          RAM: (24) - 4GB DIMM 96GB RAM installed
                          RAID: PERC 5/i (RAID-5)
                          HDD: (5) - 300GB Hitachi Ultrastar 15K600 HUS156030VLS60 15k RPM 16MB Cache SAS 6Gb/s 3.5"

                          Host02:
                          CPU: (4) - Xeon X7350 @ 2.93GHz
                          RAM: (24) - 4GB DIMM 96GB RAM installed
                          RAID: PERC 5/i (Msft Storage Spaces)
                          HDD: (5) - 1TB Seagate Constellation ES.3 ST1000NM0023 7200 RPM 128MB Cache SAS 6Gb/s 3.5"

                          scottalanmillerS 2 Replies Last reply Reply Quote 0
                          • StrongBadS
                            StrongBad @KOOLER
                            last edited by

                            @KOOLER said:

                            Scale needs 3 nodes, they don't have anything to install on existing servers like OP has and Scale has no Hyper-V support.

                            Scale would be a change of direction. No need for John to manage his hypervisor or storage. Everything in a single package, ready to go.

                            KOOLERK 1 Reply Last reply Reply Quote 1
                            • ryan from xbyteR
                              ryan from xbyte
                              last edited by

                              It's good to see this thread with more legs over here on Mango than on SW.

                              Here is the interesting thing going on with the Dell generations now. We see the 11th gen still popular (R510s and R710s) if you only need 6-core CPUs. If you need 8-cores, then we see people skipping the 12th generation and going on to the 13th generation servers like the R730xd. The newer CPUs are so powerful at the low end and therefore so inexpensive, it is hard to justify other the 12th generation. There are some exceptions if you are okay with E5-2600 version 1 CPUs. That market is crashing and you can find some deals.

                              This is why we encourage people to call us so we can walk through the options in the secondary market. It is very different than buying directly through Dell.

                              scottalanmillerS J 3 Replies Last reply Reply Quote 4
                              • scottalanmillerS
                                scottalanmiller @JohnFromSTL
                                last edited by

                                @JohnFromSTL said:

                                RAID: PERC 5/i (RAID-5)

                                Well fixing that will be the first thing 🙂 We can do RAID 6 on the new servers.

                                J 1 Reply Last reply Reply Quote 2
                                • scottalanmillerS
                                  scottalanmiller @ryan from xbyte
                                  last edited by

                                  @ryan-from-xbyte said:

                                  It's good to see this thread with more legs over here on Mango than on SW.

                                  FTW!

                                  1 Reply Last reply Reply Quote 3
                                  • scottalanmillerS
                                    scottalanmiller @ryan from xbyte
                                    last edited by

                                    @ryan-from-xbyte said:

                                    The newer CPUs are so powerful at the low end and therefore so inexpensive, it is hard to justify other the 12th generation.

                                    Except for when you are building storage devices. The R720xd really shines where CPU makes no difference.

                                    ryan from xbyteR 1 Reply Last reply Reply Quote 2
                                    • ryan from xbyteR
                                      ryan from xbyte @scottalanmiller
                                      last edited by

                                      @scottalanmiller said:

                                      If the R910 is maxing out at, say, 20% CPU, then my guess is that an R720xd will do the trick to take over its load. The R720xd has two, faster procs than the R910. Not only are the individual procs faster, but by moving from quad procs to dual procs you gain a small amount of efficiency just from that one move. So faster procs and more efficient proc usage and then cutting the total number of procs in half.... seems like you will be okay.

                                      You don't even need to go with a R720xd when comparing the R910. You can go with a R620 and get 10x2.5" drives. Cluster a couple of those together and you are far better off than getting an R910 and you will save a fortune on power.

                                      scottalanmillerS 1 Reply Last reply Reply Quote 2
                                      • J
                                        JohnFromSTL @scottalanmiller
                                        last edited by

                                        @scottalanmiller said:

                                        @JohnFromSTL said:

                                        RAID: PERC 5/i (RAID-5)

                                        Well fixing that will be the first thing 🙂 We can do RAID 6 on the new servers.

                                        Yeah, it was great when it was new...7 Years ago! I keep waiting for something to fail on these servers.

                                        1 Reply Last reply Reply Quote 1
                                        • scottalanmillerS
                                          scottalanmiller @JohnFromSTL
                                          last edited by

                                          @JohnFromSTL said:

                                          RAM: (24) - 4GB DIMM 96GB RAM installed

                                          Matching or beating that will be easy. Even the older R720 / R720xd commonly came with 128GB. So no problem getting more than enough for you.

                                          1 Reply Last reply Reply Quote 0
                                          • KOOLERK
                                            KOOLER Vendor @StrongBad
                                            last edited by

                                            @StrongBad said:

                                            @KOOLER said:

                                            Scale needs 3 nodes, they don't have anything to install on existing servers like OP has and Scale has no Hyper-V support.

                                            Scale would be a change of direction. No need for John to manage his hypervisor or storage. Everything in a single package, ready to go.

                                            I cannot say better!

                                            1 Reply Last reply Reply Quote 0
                                            • 1
                                            • 2
                                            • 3
                                            • 4
                                            • 5
                                            • 6
                                            • 7
                                            • 8
                                            • 9
                                            • 10
                                            • 6 / 10
                                            • First post
                                              Last post