ML
    • Recent
    • Categories
    • Tags
    • Popular
    • Users
    • Groups
    • Register
    • Login

    Microsoft Licensing Primer

    IT Discussion
    licensing microsoft licensing
    16
    237
    142.2k
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • brianlittlejohnB
      brianlittlejohn @scottalanmiller
      last edited by

      @scottalanmiller Something like that... I think I got my Standards for $750...

      1 Reply Last reply Reply Quote 0
      • scottalanmillerS
        scottalanmiller
        last edited by

        That makes sense, that would be the 14 number. So if you know you can do 13, standard. But if you hit 14, DC for sure.

        brianlittlejohnB 1 Reply Last reply Reply Quote 0
        • brianlittlejohnB
          brianlittlejohn @scottalanmiller
          last edited by

          @scottalanmiller I would say if you get to 10vms, it is worth the extra price. For the flexibility of adding a vm whenever needed.

          1 Reply Last reply Reply Quote 1
          • scottalanmillerS
            scottalanmiller
            last edited by

            I would generally agree, but ignoring flexibility and soft benefits, the inflection point appears to currently be between 13 and 14 VMs per host.

            1 Reply Last reply Reply Quote 0
            • brianlittlejohnB
              brianlittlejohn
              last edited by

              It would actually be 12, if you have 13 you have to buy the licenses for 14

              scottalanmillerS 1 Reply Last reply Reply Quote 1
              • scottalanmillerS
                scottalanmiller @brianlittlejohn
                last edited by

                @brianlittlejohn said:

                It would actually be 12, if you have 13 you have to buy the licenses for 14

                Duh, of course. Late on a Friday, needing some beer here, I guess.

                brianlittlejohnB 1 Reply Last reply Reply Quote 0
                • brianlittlejohnB
                  brianlittlejohn @scottalanmiller
                  last edited by

                  @scottalanmiller Thats what I'm about to do, either craft beer or wine. My friends are having a make you own pasta night... so im leaning towards wine unless I see a beer I cant do without.

                  1 Reply Last reply Reply Quote 0
                  • scottalanmillerS
                    scottalanmiller
                    last edited by

                    I've got a single beer left in the fridge. Doubt that I am going to walk to the store for more, though.

                    1 Reply Last reply Reply Quote 0
                    • JaredBuschJ
                      JaredBusch
                      last edited by

                      I have an almost full bottle of sake to tide me over tonight.

                      First snow is about to arrive in Chicagoland. The kids are excited.

                      1 Reply Last reply Reply Quote 0
                      • brianlittlejohnB
                        brianlittlejohn
                        last edited by

                        Went to the store and ended up with wine and beer...

                        1 Reply Last reply Reply Quote 0
                        • scottalanmillerS
                          scottalanmiller
                          last edited by

                          I should probably do that. I think that we've lost track of this thread now.

                          1 Reply Last reply Reply Quote 0
                          • DashrenderD
                            Dashrender
                            last edited by

                            That 12 VMs isn't just 12 on a single host for normal operations - if the plan is to move VMs around for failover, you're down to a max of 6 on each server before buying DC makes sense.

                            scottalanmillerS brianlittlejohnB 2 Replies Last reply Reply Quote 1
                            • scottalanmillerS
                              scottalanmiller @Dashrender
                              last edited by

                              @Dashrender said:

                              That 12 VMs isn't just 12 on a single host for normal operations - if the plan is to move VMs around for failover, you're down to a max of 6 on each server before buying DC makes sense.

                              Correct you are. IF you have DR needs, the numbers change a lot.

                              1 Reply Last reply Reply Quote 1
                              • BRRABillB
                                BRRABill
                                last edited by

                                Yeah take that beer talk elsewhere, LOL.

                                1 Reply Last reply Reply Quote 0
                                • brianlittlejohnB
                                  brianlittlejohn @Dashrender
                                  last edited by

                                  @Dashrender said:

                                  That 12 VMs isn't just 12 on a single host for normal operations - if the plan is to move VMs around for failover, you're down to a max of 6 on each server before buying DC makes sense.

                                  Yea, we were talking about the most that can run on a machine including all DR/Maintenance issues.

                                  DashrenderD 1 Reply Last reply Reply Quote 1
                                  • DashrenderD
                                    Dashrender @brianlittlejohn
                                    last edited by

                                    @brianlittlejohn said:

                                    @Dashrender said:

                                    That 12 VMs isn't just 12 on a single host for normal operations - if the plan is to move VMs around for failover, you're down to a max of 6 on each server before buying DC makes sense.

                                    Yea, we were talking about the most that can run on a machine including all DR/Maintenance issues.

                                    In that case, you're limited to 6 VMs per host otherwise you're better off buying DC for each server.

                                    scottalanmillerS 1 Reply Last reply Reply Quote 0
                                    • scottalanmillerS
                                      scottalanmiller @Dashrender
                                      last edited by

                                      @Dashrender said:

                                      @brianlittlejohn said:

                                      @Dashrender said:

                                      That 12 VMs isn't just 12 on a single host for normal operations - if the plan is to move VMs around for failover, you're down to a max of 6 on each server before buying DC makes sense.

                                      Yea, we were talking about the most that can run on a machine including all DR/Maintenance issues.

                                      In that case, you're limited to 6 VMs per host otherwise you're better off buying DC for each server.

                                      Only if you want them to float individually. If you only move them at the time of a system failure, the licenses would migrate to the new host with you.

                                      JaredBuschJ DashrenderD 2 Replies Last reply Reply Quote 0
                                      • JaredBuschJ
                                        JaredBusch @scottalanmiller
                                        last edited by

                                        @scottalanmiller said:

                                        @Dashrender said:

                                        @brianlittlejohn said:

                                        @Dashrender said:

                                        That 12 VMs isn't just 12 on a single host for normal operations - if the plan is to move VMs around for failover, you're down to a max of 6 on each server before buying DC makes sense.

                                        Yea, we were talking about the most that can run on a machine including all DR/Maintenance issues.

                                        In that case, you're limited to 6 VMs per host otherwise you're better off buying DC for each server.

                                        Only if you want them to float individually. If you only move them at the time of a system failure, the licenses would migrate to the new host with you.

                                        The point is that moving the license at time of failure means you are restricted to every 90 days. This discussion is around where the cut over is to be basically as flexible as datacenter, yet not purchasing datacenter.

                                        1 Reply Last reply Reply Quote 0
                                        • DashrenderD
                                          Dashrender @scottalanmiller
                                          last edited by

                                          @scottalanmiller said:

                                          @Dashrender said:

                                          @brianlittlejohn said:

                                          @Dashrender said:

                                          That 12 VMs isn't just 12 on a single host for normal operations - if the plan is to move VMs around for failover, you're down to a max of 6 on each server before buying DC makes sense.

                                          Yea, we were talking about the most that can run on a machine including all DR/Maintenance issues.

                                          In that case, you're limited to 6 VMs per host otherwise you're better off buying DC for each server.

                                          Only if you want them to float individually. If you only move them at the time of a system failure, the licenses would migrate to the new host with you.

                                          Also, in addition to JB's post, You can't move them back after the failure is resolved for 90 days, legally. If you can afford to live without the second server for those 90 days, then why have the second server in first place, just build a better single server.

                                          1 Reply Last reply Reply Quote 1
                                          • BRRABillB
                                            BRRABill
                                            last edited by

                                            On the server side, this would also be a good use for SA in smaller environments as you are allowed to have a cold boot server for DR purposes, right?

                                            scottalanmillerS 1 Reply Last reply Reply Quote 0
                                            • 1
                                            • 2
                                            • 6
                                            • 7
                                            • 8
                                            • 9
                                            • 10
                                            • 11
                                            • 12
                                            • 8 / 12
                                            • First post
                                              Last post